For the Swiss green trade
Hours, machines, plants and disposal are recorded where they happen — on the site. Report, costing and invoice then work from the same figures.
In preparation
jardin.box is being built. We are talking to firms in the green trade before we build anything — what you read here is the plan, not the state of it.
Four specialisms
Most firms in the green trade build new gardens, maintain them and inspect trees — often in the same month, for the same customers. The software does not split that into four programmes.
New planting with completion and establishment care, and the SIA 318 establishment guarantee as a deadline rather than a note in a drawer.
Maintenance contracts with recurring rounds, and the contribution margin per contract rather than per invoice.
Tree inspection on risk-based intervals, and the duty-of-care record when somebody asks for it.
Quantities and measurement on NPK positions, so the billing follows the tender rather than the other way round.
What is in it
In the green trade the same figure gets written down several times: the hour on the report, the machine in the log, the skip on the weighbridge ticket. Every one of them belongs on the same invoice in the end.
Rapport
Hours, machines and material recorded on the site and signed there.
Machines
Operating hours, service intervals and Suva inspections per machine. The machine rate feeds the costing.
Disposal
Excavated material classified under the VVEA, skips dispatched, weighbridge tickets on the site instead of in the glovebox.
Plant protection
Application journal, permits and their renewal dates — including the continuing-education hours behind them.
Invasive plants
A register per surface, batches kept separate, and the disposal record the municipality wants to see.
Costing
Hourly rates and quantities on NPK positions. The quote works with the rates the report later confirms.
Built for here
Software that does not know the green branch GAV calculates overtime wrongly and never notices. That is the part you cannot buy in.
If you run a firm in the green trade: 30 minutes, no preparation. We ask how you bill today — and what hurts every time.